Full or Part Bathroom  Refits

Old cast iron bath removed, bath turned 90deg. and a wall mounted  sink installed.

Room tiled and pipe work boxed in.

 

Old avocado suite removed, complete refit including wall tiles, floor tiles, pine clad ceiling and ceiling spot lights.

Old cast iron bath removed, corner bath installed with under floor heating and full wall and floor tiling.

Chrome heated towel rail added to replace standard radiator.

 

Bathroom completely gutted.

Sunken bath installed with step up , mosaic tile surround

 

Your Problems Solved

TEL 617065275